under coated floor with automotive under coating - protects & seals
|
cutting the inner skins .
|
except for the door cutout the right side is ready
|
Gluing the inner skin, next thing is to cut the door opening
|
final fit check, next step is to glue & screw. Spars and inner roof comes next
|
one side glued & screwed to floor - Gorilla Glue is great stuff
|
while glue is setting up, cut all roof spars & hatch framing
|
Both sides glued & screwed to floor - NOW ready to locate spars & inner roof skin
|
With the counter top being a structural part, decided to locate the main
|
counter top and frame the galley and interior cabinets.
|
locating roof spars with ceiling thickness shim
|
spars located and numbered for removal, (for locating ceiling)
|
just another view, also showing vent location
|
plywood does not compress - countersink all holes for flat head screws
|
outside view of ceiling installed .
|
How sweet it is - ceiling (formica) is sandwished between spars & inner side skins
|
The skin for the most part is a floater will add 3M adhesive to first & last spar
|
Aw flooring, must have flooring even though you won't see it
|
Doors are now finished, panels glued, window located & finished trimed
|
Hinge installed (on door) checking for fit & gap (1/4")
|